CASE STUDIES

About

Case Studies

Year: 2017

 

Project: High Resolution Regional Bathymetry Survey in the Vicinity of Sizewell B Power Station

 

Client: EDF Energy Nuclear Generation Ltd

Year: 2015 - 2017

 

Project: Marine Mammal Monitoring Campaign in the Bristol Channel for the Proposed Tidal Lagoon in Swansea and Cardiff

 

Client: Tidal Lagoon Power

Year: 2013 - 2018

 

Project: UK Civil Hydrographic Programme

 

Client: Maritime Coastguard Agency

Year: 2012 - 2016

 

Project: Pre-Construction Geophysical, Oceanographic and Environmental Surveys for the Proposed Tidal Lagoon at Swansea and Cardiff

 

Client: Tidal Lagoon Power

Year: 2015

 

Project: Bathymetric Survey and Sediment Sampling of a Nurek Reservoir, Tajikistan.

 

Client: HR Wallingford

© Titan Environmental Surveys Ltd 2016

Registered in England and Wales No. 3890108, VAT No. 742230076

Orion House, Parc Crescent, Waterton Industrial Estate, Bridgend, South Wales, CF31 3BQ

 

Tel:  +44 (0) 1656 673673 

Fax: +44 (0) 1656 673674 

 

  • LinkedIn - White Circle
  • Twitter - White Circle

Balch i fod yn cefnogi busnesau Cymraeg