top of page

CASE STUDIES

About

Case Studies

geoswathe deployment

Year: 2017

 

Project: High Resolution Regional Bathymetry Survey in the Vicinity of Sizewell B Power Station

 

Client: EDF Energy Nuclear Generation Ltd

Relevant Documents
CPD Servicing

Year: 2015 - 2017

 

Project: Marine Mammal Monitoring Campaign in the Bristol Channel for the Proposed Tidal Lagoon in Swansea and Cardiff

 

Client: Tidal Lagoon Power

MBES High resoltion wreckdata IHO Order 1a

Year: 2013 - 2018

 

Project: UK Civil Hydrographic Programme

 

Client: Maritime Coastguard Agency

Tidal Lagoon Power Project

Year: 2012 - 2016

 

Project: Pre-Construction Geophysical, Oceanographic and Environmental Surveys for the Proposed Tidal Lagoon at Swansea and Cardiff

 

Client: Tidal Lagoon Power

Resevoir bathymetric survey

Year: 2015

 

Project: Bathymetric Survey and Sediment Sampling of a Nurek Reservoir, Tajikistan.

 

Client: HR Wallingford

bottom of page